Austroads
  • Home
  • About Austroads
    • About Austroads
    • Strategic Plan 2012-2016
    • Programs
    • Projects
    • International
    • REAAA
    • Local Government
    • Contact Us
    • Education Resource Centre
  • Assets
  • Assets
  • Bicycles
  • Bridges
  • Driver Licences
    • Drivers Licences
    • Assessing Fitness to Drive
    • Overseas Driver Licences
  • Freight
  • Network Operations
  • Pavements
  • Planning and Evaluation
  • Project Delivery
    • Prequalification
  • Road Design
  • Road Tunnels
  • Safety
  • Traffic Management
  • Vehicle Registration
    • Vehicle Registration
    • NEVDIS
  • hiddenmenu
  • Performance Indicators
  • hiddenmenu
  • Staff Access
  • Assessing Fitness to DriveAssessing Fitness to Drive
  • Prequalification Prequalification
  • Cycling Resource CentreCycling Resource Centre
  • February Newsletter 2013February Newsletter 2013
  • News
  • Links
  • Contact Us
Banner 1
banner2
banner3
banner4
banner5
banner6
banner7
banner8

Online Publications

  • Public Access
  • Member Access
A- A A+ Print
  • Home
  • About Austroads
  • Programs

Programs

To deliver outcomes, Austroads takes the program management approach, which allows us to identify, deliver and manage actions addressing Austroads strategic priorities. Each program undertakes a range of projects that will address these priorities.

Austroads utilises the expertise of its member organisations to deliver these programs. This encourages a collaborative approach and facilitates learning, development, sharing and a high level of consistency across jurisdictions.

Each program is headed by a program manager. Program managers are senior managers within Austroads member organisations who are responsible for one program for a proportion of their time in conjunction with their responsibilities within their own organisations. They develop and manage a work program of projects that align with the strategic priorities. Program managers report directly to the board.

The programs are supported by a group of representatives from member organisations to identify and develop project proposals related to the objectives of the strategic plan; oversee projects; promote the dissemination of results and provide a forum for the exchange of information between Austroads’ members and related organisations. Some groups also include representation from observers and other stakeholder organisations. They also oversee the updating of Austroads guides and provide a forum to develop consistent and improved practice.

Austroads Programs

Assets

Objective:  
Provide the road services the community needs at least long term cost.

Program Manager:

David Darwin

National Assets Manager
New Zealand Transport Agency

Program Support:

Sarah Mayne

Austroads Asset Program Assistant
New Zealand Transport Agency
Private Bag 6995
Wellington 6141
NEW ZEALAND
Phone: +64 4 894 6305
Email
: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Guide Publications

Austroads Guide to Asset Management

  • Part 1: Introduction to Asset Management
  • Part 2: Community and Stakeholder Requirements
  • Part 3: Asset Strategies
  • Part 4: Program Development and Implementation
  • Part 5: Pavement Performance
  • Part 5A: Inventory
  • Part 5B: Roughness
  • Part 5C: Rutting
  • Part 5D: Strength
  • Part 5E: Cracking
  • Part 5F: Skid Resistance
  • Part 5G: Texture
  • Part 5H: Performance Modelling
  • Part 6: Bridge Performance
  • Part 7: Road Related Assets Performance
  • Part 8: Asset Valuation and Audit

Groups

Asset Task Force


Freight

Objective:
Improve productivuty and sustainability in meeting the freight task

Program Manager:

Michael Sutton

General Manager, Land Transport Reform
Commonwealth Department of Infrastructure and Transport

Program Support:

Julie Cooper

Austroads Program Assistant
VicRoads
3rd Floor, South Building
60 Denmark Street
Kew VIC 3101
Phone: +61 3 9854 2896
Fax: +61 3 9854 2668
Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Groups

Freight Task Force

Network

Objective:       
Improve productivity and reliability of road use.

Program Manager:

Steve Brown

Executive Director - Regional Services
VicRoads

Program Support:

Heather Bishop

Program Assistant
VicRoads
Level 6, 60 Denmark St
KEW  VIC  3101
Phone: +61 3 9854 2867
Fax: +61 3 9854 2500
Email
: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Guide Publications

Austroads Guide to Traffic Management

  • Part 1: Introduction to Traffic Management
  • Part 2: Traffic Theory
  • Part 3: Traffic Studies and Analysis
  • Part 4: Network Management
  • Part 5: Road Management
  • Part 6: Intersections. Interchanges and Crossings
  • Part 7: Traffic Management in Activity Centres
  • Part 8: Local Area Traffic Management
  • Part 9: Traffic Operations
  • Part 10: Traffic Control and Communication Devices
  • Part 11: Parking
  • Part 12: Traffic Impacts of Developments
  • Part 13: Road Environment Safety

Groups

Network Task Force
Traffic Management Working Group
Australian Bicycle Council
Cooperative ITS Steering Committee

Registration and Licensing

Objective:
 

Enhance consistency, security and integrity of systems and improve economic and social outputs.

Program Manager:

Julie Holmes

Director, Registration and Licensing
Department of Planning, Transport and Infrastructure South Australia

Program Support:

Jane Fitzgerald

Project Manager for Registration and Licensing
Department for Planning, Transport and Infrastructure South Australia
GPO Box 1533
Adelaide SA 5001
Phone: +61 8 8343 2542
Fax: +61 8 8343 2977
Email
: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Groups

Registration and Licensing Task Force

Safety

Objective:
Prevent death and serious injuries using a safe system approach.

Program Manager:

Pam Palmer

Senior Manager, Safer Road Users
Road Safety, Transport Safety Branch
Queensland Department of Transport and Main Roads

Program Support:

Deborah Evans

Principal Advisor (Austroads)
Queensland Department of Transport and Main Roads
GPO Box 673
FORTITUDE VALLEY QLD 4001
Phone: +61 7 3253 4319
Fax: +61 7 3253 4410
Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Guide Publications

Austroads Guide to Road Safety

  • Part 1: Road Safety Overview
  • Part 2: Road Safety Strategy and Evaluation
  • Part 3: Speed Limits and Speed Management
  • Part 4: Local Government and Community Road Safety
  • Part 5: Road Safety for Rural and Remote Areas
  • Part 6: Road Safety Audit
  • Part 7: Road Network Crash Risk Assessment and Management
  • Part 8: Treatment of Crash Locations
  • Part 9: Roadside Hazard Management

Groups

Safety Task Force

Technology

Objective:
Develop and promote best practice and innovation.

Program Manager:

Chris Harrison

General Manager Engineering Technology
Roads and Maritime Services New South Wales

Program Support:

Tye Anthonisz

Technology Program Assistant
Roads and Maritime Services
PO Box 3035
Parramatta NSW 2124
Phone: +61 2 8837 0413
Email
: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Guide Publications

Austroads Guide to Bridge Technology

  • Part 1: Introduction and Bridge Performance
  • Part 2: Materials
  • Part 3: Typical Superstructures, Substructures and Components
  • Part 4: Design Procurement and Concept Design
  • Part 5: Structural Drafting
  • Part 6: Bridge Construction
  • Part 7: Maintenance and Management of Existing Bridges

Austroads Guide to Pavement Technology

  • Part 1: Introduction to Pavement Technology
  • Part 2: Pavement Structural Design
  • Part 3: Pavement Surfacings
  • Part 4: Pavement Materials
  • Part 4A: Granular Base and Sub Base Materials
  • Part 4B: Asphalt
  • Part 4C: Materials for Concrete Road Pavements
  • Part 4D: Stabilised Materials
  • Part 4E: Recycled Materials
  • Part 4F: Bituminous Binders
  • Part 4G: Geotextiles and Geogrids
  • Part 4H: Test Methods
  • Part 4I: Earthworks Materials
  • Part 4J: Aggregate and Source Rock
  • Part 4K: Seals
  • Part 4L: Stabilising Binders
  • Part 5: Pavement Evaluation and Treatment Design
  • Part 6: Unsealed Pavements
  • Part 7: Pavement Maintenance
  • Part 8: Pavement Construction
  • Part 9: Pavement Work Practices
  • Part 10: Sub-Surface Drainage

Austroads Guide to Project Delivery

  • Part 1: Overview
  • Part 2: Project Delivery Planning and Control
  • Part 3: Contract Management
  • Part 4: Direct Management and Construction

Austroads Guide to Project Evaluation

  • Part 1: Introduction to Project Evaluation
  • Part 2: Project Evaluation Methodology
  • Part 3: Models and Procedures
  • Part 4: Project Evaluation Data
  • Part 5: Impact on National and Regional Economies
  • Part 6: Distributional (Equity) Effects
  • Part 7: Post-completion Evaluation
  • Part 8: Examples

Austroads Guide to Road Design

  • Part 1: Introduction to Road Design
  • Part 2: Design Considerations
  • Part 3: Geometric Design
  • Part 4: Intersections and Crossings - General
  • Part 4A: Unsignalised and Signalised Intersections
  • Part 4B: Roundabouts
  • Part 4C: Interchanges
  • Part 5: Drainage – General and Hydrology Considerations
  • Part 5A: Drainage – Road Surface, Networks, Basins and Subsurface
  • Part 5B: Drainage – Open Channels, Culverts and Floodways
  • Part 6: Roadside Design, Safety and Barriers
  • Part 6A: Pedestrian and Cyclist Paths
  • Part 6B: Roadside Environment
  • Part 7: Geotechnical Investigation and Design
  • Part 8: Process and Documentation

Austroads Guide to Road Transport Planning

Austroads Guide to Road Tunnels

  • Part 1: Introduction to Road Tunnels
  • Part 2: Planning, Design and Commissioning
  • Part 3: Operation and Maintenance

Groups

Bridge Technology Task Force
Pavement Technology Task Force
Project Delivery Task Force
Road Design Task Force
Evaluation and Planning Task Force
Road Tunnels Task Force

Back to Top

Copyright © 2011 Austroads | Privacy Statement | Terms of Use | All Rights Reserved. Website Design Infinity