Roadworks R3
Drivers
Road Construction
Road Operations

Roadworks R3

R2 activities plus the majority of the following.


Typical Characteristic of Contract Work

General features of works

  • More complex intersections located at urban location.
  • Medium to large scale of works.

Earthworks

  • General earthworks exceeding 5 m in cut or fill.
  • Mechanically stabilised earth construction to a nominal 5 m in height.
  • Excavation in hard rock where blasting is likely to be required.

Pavement

  • Pavement construction using marginal materials (non-standard).
  • Pavement construction using modified materials (e.g. cement treated sub-base).
  • Deep lift asphalt.

Drainage

  • Special foundation and/or subgrade and subsoil drainage treatments.
  • Includes large size culverts, multiple bays and link slab culverts.

Miscellaneous

Permanent traffic signals.

Traffic management

  • Moderately complex worksite traffic management.
  • Typically AADT<5000 vehicles/day.
  • Multiple staging of simple traffic shift.
  • Hard wired temporary traffic signals.

Services

Moderately complex service relocations including conduits (e.g. electrical, communication services).

Subcontractors / consultants

  • Non-complex design management.
  • Moderately complex project management including subcontractor management and coordination.

Stakeholder/project management

  • Moderately complex to complex community/stakeholder management.
  • Moderately complex environmental risk management.

Cultural heritage and environmental management

  • Relocation of local flora and fauna.
  • Installation of fauna fencing.
  • Identification of culturally significant tree or sacred site.

Minimum Requirements: Company Profile

Minimum period of operation

Approximately four years as a head contractor.

Demonstrated performance

Good general performance on R2/B2 contracts.

Management systems

Third party JAS-ANZ certification of the following:

  • Quality Management System to ISO 9001.
  • OH&S (WHS) Management System to AS/NZS4801 or OHSAS 18001.
  • Environmental Management System to ISO 14001.

Notes

Accreditation under the Australian Government’s Building and Construction OH&S Accreditation Scheme is deemed to satisfy the WHS (OHS) requirement for prequalification at all levels.

Where third party certification of management systems is required for categories R1 /B1, independent auditor that assesses the Applicant’s management systems against the checklists or certifies the Integrated Management System must be:

  • a conformity assessment body accredited by the Joint Accreditation System for Australia and New Zealand (JAS-ANZ) to the relevant standard, or
  • registered by Exempla Global (or equivalent), with experience in the civil construction industry.

Third party certificates must state that the certification specifically applies to road / bridge construction. A reference to other categories alone (eg civil construction) is insufficient.


Minimum Requirements: Company Experience

Experience in successfully delivering contracts.

Sound experience with at least two R2/B2 projects in the last five years.

Project management

  • Demonstrated a sound understanding of the principles of project management.
  • Demonstrated successful utilisation of project management.
  • Utilises a project-specific project management plan for R3/B3 - type contracts or higher.

Partnering/relationship management

Has successfully participated in partnering/relationship management at a level relevant to category R3/B3 and demonstrates a positive attitude and willingness.

Community/stakeholder engagement

  • Structured approach to community/stakeholder engagement.
  • Evidence of successful community/stakeholder engagement activities on relevant past projects – few complaints.
  • Adequate sample/example communications plans and documented strategies.
  • Adequate evidence of meetings/workshops, surveys etc.

Utilisation of management systems

  • Example Quality, WHS Environmental Management Plans are satisfactory.
  • Compliance audits show systems are working and any non- conformances have been dealt with effectively.
  • Lost Time Injury Frequency Rates for the past three years are similar to industry averages.
  • Workers compensation claims over an extended period of time are similar to industry averages.
  • No instances of serious Improvement Notices/Infringement Notices in the areas of environment/WHS.

Subcontractor management

  • Policy and a structured approach to management of consultants, subcontractors and suppliers.
  • Referee comments are generally positive and no issues raised by referees regarding subcontractor management.

Industrial relations

Occurrence of industrial relations disputes is similar to industry average.

Human resources

  • Some evidence of professional development /training.
  • Readily available HR/IR manuals and policies.

Worksite traffic management performance

  • Policies and/or procedures in place and key personnel are appropriately trained and accredited; or an established relationship with accredited Worksite traffic management subcontractor.
  • Evidence of effective traffic management performance in relation to works of a similar nature to those in R3/B3.

Minimum Requirements: Technical Capacity

Preferable minimum qualifications and experience of personnel

  • Key personnel have the qualifications and experience relevant to the duties and responsibilities of their nominated position.
  • At least half of the project managers are qualified civil engineers.
  • At least half of the key professionals/para-professionals and key supervisory staff have five years construction experience and at least two years experience each in R2/B2-type contracts.

Demonstrated capability to provide plant and equipment

The entity has demonstrated the capability to provide plant and equipment required to properly resource R3/B3 contracts.

Contacts

National Office

Phone: +61 2 8265 3300

Level 9, 287 Elizabeth Street
Sydney NSW 2000
Australia

austroads@austroads.com.au

Member Organisations

Related Organisations

 

Privacy Policy

Terms of Use

Signup for Austroads News